Olymel to shut poultry additional processing plant

0
60

[ad_1]

Olymel is making changes to its poultry additional processing operations as it should shut its plant in Paris, Ontario, whereas increasing its plant in Oakville, Ontario.

The corporate introduced these deliberate adjustments to its staff and to the media on September 13.

In a press launch, Olymel acknowledged that these choices are a part of a plan to “redevelop and optimize the corporate’s processed poultry sector.”

The Paris plant employs 93 individuals, and the final day of operation for the power is predicted to be December 22.

The Paris plant staff will obtain presents to relocate to the Oakville plant, about 75 kilometers away, or different crops in Port Colbourne or Brampton, additionally each in Ontario.

“The choice to shut the Paris plant definitively was a lot thought-over, and the selection to consolidate the Paris operations with these in Oakville was taken to make sure effectivity and value financial savings. This choice will forestall the projected expensive investments wanted to replace the corporate’s tools on the Paris plant, notably to eradicate noise and odor disturbances for the neighborhood. After renovations are full, the Oakville plant will be capable to perform its present operations whereas integrating the actions from the Paris plant into its manufacturing strains. I do know that the announcement of the closure is troublesome information for the Paris staff. On behalf of the corporate, I want to lengthen appreciation to them for his or her years of loyal service. Between now and the closure in December, Olymel will make each effort to assist in the relocation or transition to employment in one other sector,” mentioned Olymel President and CEO Yanick Gervais.

Following the closure of the Paris plant, Olymel will assess all choices for the Paris constructing, which incorporates the opportunity of promoting it.

Adjustments at Oakville, Sainte-Rosalie crops

With the intention to broaden the capability on the Oakville plant, Olymel is investing CA$8 million (US$5.92 million).

This enlargement venture will contain “main renovations beginning within the coming weeks,” the corporate introduced.

One of many two manufacturing strains from the Paris plant can be put in in Oakville, and as soon as these adjustments are made, the Oakville plant will require 62 further staff.

Different tools from the Paris plant can be transferred to the corporate’s poultry additional processing plant in Sainte-Rosalie, Quebec. In keeping with the press launch, in doing so, Olymel will lower your expenses it would in any other case have spent for brand new tools. The corporate didn’t provide particular info regarding whether or not the tools switch would result in new jobs in Sainte-Rosalie, however it did say the adjustments there could be “bettering employment prospects,” in addition to enhance manufacturing capability for “sure poultry merchandise.”

Different latest adjustments for Olymel

Olymel, the meat and poultry subsidiary of Sollio Cooperative, has underwent a number of closures lately because the guardian firm makes an attempt to get better from monetary struggles. Sollio misplaced CA$337.5 million in 2022.

Before now, nonetheless, the cuts have been restricted to its pork operations.

In Might, Olymel introduced its intent to shut 5 sow items in Alberta and one in Saskatchewan.

Previous to that, Olymel introduced it could completely shut its hog slaughtering and reducing plant in Beauce, Quebec; pork additional processing crops in Blainville and Laval, Quebec; its pork additional processing plant in Henryville, Quebec; and its pork processing plant in St-Hyacinthe, Quebec.

Olymel presently has 24 pork and poultry processing crops in Canada, in addition to 5 distribution facilities. It operates within the provinces of Quebec, Ontario, Alberta, Saskatchewan and New Brunswick.

The corporate markets its merchandise primarily below the Olymel, Lafleur, Flamingo, La Fernandière, Pinty’s, Tour Eiffel and F. Ménard manufacturers.

[ad_2]